OUR FACILITY

A purpose-built laboratory on 12 acres

SELA’s laboratory complex is located in Cartersville, Marshall City, on the Marshall Highway in Margibi County — strategically positioned on one of Liberia’s main transport corridors for easy sample delivery from construction sites across the country. The 12-acre site is fully owned, with the deed probated and registered with the Liberia Land Authority.

The facility has been designed by Architect Talor Z. Kollie (drawing set SELA/001-2025) as a permanent, purpose-built laboratory complex that meets the physical and operational requirements of ISO/IEC 17025:2017 from the ground up.


SITE FEATURES

Designed for precision, built for growth

Strategic Location

On the Marshall Highway, Margibi County — accessible from Monrovia and connected to construction corridors across the country.

Loading Bay

Dedicated loading bay for trucks delivering samples straight from site — efficient chain of custody from field to lab.

Solar Power

Roof-mounted solar array for power resilience — critical for maintaining calibrated equipment and uninterrupted testing operations.

Four Laboratories

Dedicated spaces for geotechnical, building materials, transport and pavement testing (Phase 1), and environmental testing (Phase 2).

Digital LIMS

A Laboratory Information Management System from day one — digital sample tracking, automated reporting, and a secure client portal for result delivery.

Room to Grow

The 12-acre site is designed to accommodate Phase 2 (environmental and GIS) and Phase 3 (satellite and mobile lab facilities) as SELA scales.


CONSTRUCTION PROGRESS

Where we stand

✓ Completed

  • Company registered with the Liberia Business Registry; tax compliant
  • US-dollar banking accounts established at UBA and International Bank (Liberia)
  • 12 acres purchased and surveyed in Marshall City
  • Deed probated and registered with the Liberia Land Authority
  • Laboratory complex fully designed (drawing set SELA/001-2025)
  • Market study complete; capability profile and first proposals out

⟶ Under Way

  • Clearing the site and the access road from the highway
  • Round 1 fundraising to break ground, equip and accredit Phase 1

The site and access road clearing are under way. Construction will commence following the completion of Round 1 fundraising, which covers groundbreaking, equipment procurement, and accreditation costs for the three Phase 1 laboratories.