Geotechnical & materials testing · September 2024 · Completed
Periodic maintenance of the 71 km Brewerville – Compoundzu corridor, including laterite pavement, repair of critical sections, bridge construction and culvert installation. SELA provided construction materials testing, geotechnical investigation and quality control.
| Client | Ministry of Public Works (MPW), Republic of Liberia |
| Lead consultant | Geoskope Limited |
| Funder | Government of Liberia |
| Completed | September 2024 |
What we did
- Field sampling and laboratory testing of soils, lateritic materials and aggregates for pavement, bridge and drainage works
- Material classification, moisture content, particle size distribution, Atterberg limits, compaction (Proctor) and California Bearing Ratio (CBR) testing, plus aggregate quality assessments
- Laboratory reports and engineering recommendations supporting QA/QC on the corridor
Have a project that needs testing or site investigation?
Tell us about your site and what you need to know. Our team will come back to you with a scope of work, schedule and an all-inclusive quotation.
