Materials testing · October 2024 · Completed

Spot repairs and routine maintenance along a 10 km section of the Bomi – Swen Mecca corridor: replacement of failed pavement sections, pothole repairs, regrading, drainage and culvert works. SELA provided construction materials testing and quality control.

ClientMinistry of Public Works (MPW), Republic of Liberia
Lead consultantGeoskope Limited
FunderGovernment of Liberia
CompletedOctober 2024

What we did

  • Collection and laboratory testing of soil, laterite and aggregate samples
  • Material classification, moisture content, particle size distribution, Atterberg limits, compaction (Proctor) and California Bearing Ratio (CBR) testing
  • Technical laboratory reports and recommendations for construction quality control

Have a project that needs testing or site investigation?

Tell us about your site and what you need to know. Our team will come back to you with a scope of work, schedule and an all-inclusive quotation.

💬Chat on WhatsApp